A man pulls a bucket full of water from h metre deep well. If the mass of rope is m and mass of bucket full of water is M, then work done by the man is
Bucket of mass M will rise by a distance of h.
While center of mass of the rope rises by height of h/2.
So, Work Done = (M+m/2).g.h
